Projects underway or recently completed
Painting (Completed)
I have the before photos below the after photo album.
Please click on this link for large pictures of the paintwork required.
Descriptions of the work required are in the smaller pictures below.
Pool and Surrounds (Concreting completed)
The concrete has gone in and the site looks great, although there is more work to do on the garden and area leading to the shed.
- Brace pool
- two poles for shade cloth
- concrete surrounding pool
- replace pool fencing
Laundry / Toilet area (in progress)
- New Toilet
- New Wash trough
- New tap for washing machine
- Concrete laundry toilet area
- Privacy wall and sliding door (completion after 23 Mar)
Ramp (completed)
- Ramp leading into carport
Maintenance Tasks
- Waterproof sewer vent pipe
- wire in the exhaust fan
- Reinstall pool fencing
- Clean decking and concrete (again)
- Clean laundry wall
- Install wall with sliding door
- Toilet and Trough
- Pool back garden area
- Area leading to shed – cleanup and fake grass
- Remove building rubbish
Longer Term Projects (Dependent on prerequisites or finance)
TBA